核电工程多项目集约化建设
中国经过 30多年不间断核电工程建设,核电工程建设管理能力和总承包能力不断提升,成功实现了多项目、多基地集约化建设;全面掌握了压水堆、重水堆、高温气冷堆、快堆等多种堆型, 30万千瓦、 60万千瓦、 100万千瓦、 170万千瓦等不同功率的核电建造技术;拥有国际一流的核电建设经验和能力,在建核电项目质量、进度、成本得到有效控制;可以满足同时开工 30台以上核电机组的需求。
Simultaneous Construction of Multiple Nuclear Power Plant Projects
Nuclear power plant construction has been going on nonstop in China over the past three decades. Extensive experience and a wealth of expertise in construction project management developed over the years have enabled contractors to build multiple projects at the same time and take advantage of economies of scale. Technologies have been developed for building pressurized water reactors, heavy water reactors, high temperature gas-cooled reactors, and fast reactors with an installed capacity of 300 MWe, 600 MWe, 1,000 MWe and 1,700 MWe. Experience and world-class capabilities give China an edge in ensuring the quality, schedule and cost of nuclear power projects under construction and the ability to construct more than 30 nuclear reactors at the same time.